The Build | « Prev [1] [2] [3] [4] Next » | |
The hull, upper steel deck and the steel pilot house roof all were completed in the yard. | ||
Then came the time to bring in the crane for the heavy lift. Loaded without incident. Safely delivered to her new temporary home next to the water. Steel decks raised. |
||
| ||
Top Next » |